REPORT on the estimates of revenue and expenditure of Parliament for the financial year 2011
3.5.2010 - (2010/2005(BUD))
Committee on Budgets
Rapporteur: Helga Trüpel
MOTION FOR A EUROPEAN PARLIAMENT RESOLUTION
on the estimates of revenue and expenditure of Parliament for the financial year 2011
The European Parliament,
(Special legislative procedure - budget)
– having regard to Article 314 of the Treaty on the Functioning of the European Union,
– having regard to Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities[1], and particularly Article 31 thereof,
– having regard to the Interinstitutional Agreement of 17 May 2006 between the European Parliament, the Council and the Commission on budgetary discipline and sound financial management[2],
– having regard to its resolution of 25 March 2010 on the guidelines for the 2011 budget procedure – Sections I, II, IV, V, VI, VII, VIII and IX[3],
– having regard to the Secretary-General's report to the Bureau on drawing up Parliament's preliminary draft estimates for the financial year 2011,
– having regard to the preliminary draft estimates drawn up by the Bureau on 19 April 2010 pursuant to Rules 23(6) and 79(1) of Parliament's Rules of Procedure,
– having regard to the draft estimates drawn up by the Committee on Budgets pursuant to Rule 79(2) of Parliament's Rules of Procedure,
– having regard to Rule 79 of its Rules of Procedure,
– having regard to the report of the Committee on Budgets (A7-0134/2010),
A. whereas in order to fulfil its tasks under the Treaty the Parliament is aiming to use and develop fully its prerogatives and whereas this will necessitate the strengthening of a number of priority areas while, at the same time, requiring a stringent approach to the use of available resources,
B. whereas, in this regard, the budgetary situation with respect to heading 5 (administrative expenditure) for 2011 warrants more than ever a careful and disciplined approach to Parliament's budget in order to reconcile the political goals and their financing,
C. whereas a pilot process of enhanced cooperation between the Bureau and the Committee on Budgets was initiated two years ago and has been maintained for the 2011 procedure,
D. whereas the prerogatives of the plenary in adopting the estimates and the final budget will be fully maintained in accordance with the Treaty provisions and the Rules of Procedure,
E. whereas two pre-conciliation meetings between delegations of the Bureau and the Committee on Budgets took place on 24 March 2010 and 13 April 2010 during which a number of key issues were discussed by the two delegations,
General Framework and overall budget
1. Notes that the level of the 2011 budget, as suggested by the Bureau, amounts to EUR 1 710 547 354, representing 20,32 % of heading 5 of the multiannual financial framework (MFF); notes that the rate of increase suggested is 5,8 % over the 2010 budget, including the Draft amending budget (DAB) No 1/2010;
2. While fully aware of the challenges ahead, takes the view that the growth rate and final level of the budget need to be adjusted in these estimates; decides that at this stage, the overall level of the budget is EUR 1 706 547 354, which represents a rate of increase of 5,5 % and represents a percentage share of 20,28 % of heading 5; also aims to clarify various issues and further examine the measures proposed, as well as to identify savings, before establishing the final budget in autumn 2010;
3. Recalls its view that, on the basis of the original MFF references negotiated in 2006 and in force since 2007, its expenditure should be established around the traditional 20% limit, taking into account the needs of the other institutions and the available margin; notes in this regard the requests by the European Economic and Social Committee and the Committee of Regions for over EUR 10 million for the year 2010 only; reiterates that the European External Action Service may also have an impact on heading 5; confirms its view that the Bureau and the Committee on Budgets have to work together to re-assess this limit before opening an interinstitutional dialogue on the matter; suggest that a working group be set up for this purpose, which should begin its work before the end of July 2010;
4. Seeks clarification on the mid-term financial programming for heading 5 and the projected margins of EUR 109 million for 2011, EUR 102 million for 2012 and EUR 157 million for 2013; considers that it would be helpful to receive information on Parliament's working hypotheses for the sixth report of the secretaries-general (October 2009) in terms of budget and posts compared to the proposal for estimates now at hand; would like to clarify which significant (potential) projects and staff developments are already included in this programming for the next 2-3 years; underlines, at the same time, that the financial programming is only a non-binding indicative planning tool and that the budgetary authority takes the final decisions;
5. While not disagreeing with the principle reasoning of a 1% share of the budget as a reasonable contingency reserve for unforeseen expenditure, agrees with the Bureau's proposal, taking into account the very restricted situation in heading 5, to set this reserve at EUR 14 million;
6. Understands that, in relation to the case on salaries pending before the Court of Justice, the total ‘effect’ for Parliament in 2011, which could amount to some EUR 12 million in the event of a ruling in the Commission’s favour, is included as a provision, across various budget lines, in the proposal;
7. Recalls its previous demands that a full budget proposal should be presented at the estimates stage in the spring and would consequently expect only minor or technical changes in the so-called 'amending letter' in the autumn;
8. Re-emphasises the importance it attaches to close cooperation between the Bureau and Committee on Budgets in jointly clarifying the budgetary consequences of decisions to be taken; stresses, also, that within each decision-making body, the use of financial statements giving a clear presentation of all the budgetary consequences to members is crucial;
Specific issues
Lisbon Treaty-related matters
9. Welcomes and approves the financing of the Bureau's suggestions in relation to these measures, i.e. the creation of a specific reserve for the 18 Members, at EUR 9,4 million;
10. Can agree with the Bureau's focus on reinforcing expertise to contribute to the objective of legislative excellence;
11. In this regard, supports the idea of finding an appropriate mix of in-house and external expertise for the policy departments depending on the type of information required for the specific files under consideration but would like further explanations as to whether and how the staff increases proposed could be used in a flexible way and wishes to receive more information on past implementation rates and demand from committees for such expertise;
12. Welcomes the fact that the Bureau took into account concerns raised over the ratio of ADs to ASTs, resulting in a decrease of 3 AST posts, compared to the initial proposal; approves the appropriations for the creation of 19 AD5 and 13 AST1 posts for the policy departments as now suggested by the Bureau;
13. Endorses the need for a reinforcement of external studies and welcomes the agreement between the Bureau and the Committee on Budgets to set the additional amount at EUR 1,7 million;
14. Notes the proposal to boost the library by 28 posts, out of which 13 for the briefing service for members (previously contract staff); can endorse the financing and incorporation of these 13 posts into its establishment plan provided an assurance is given that they will be filled following open competitions and that a corresponding saving is made in the financial envelope for contracts; considers that a further strengthening in terms of funds and human resources of the existing information services should go hand in hand with the development of a user-friendly system, which would allow Members to have easy access to all the information produced in the house; decides to enter the appropriations for the 15 additional posts in the estimates but places half of this amount in reserve pending:
- further justifications on how these posts would be used to improve expertise services for Members;
- concrete information about the steps undertaken by the Bureau and administration to put in place an internal Knowledge Management System, including the timetable envisaged for its implementation and any savings resulting from the rationalisation of information sources;
15. Considers that awareness and visibility for the two above indirect support services, including through Parliament's web pages, should be ensured for the benefit of Members;
16. Recalls its resolution on the guidelines in which an evaluation was already called for, including a detailed financial statement of the overall costs that would result from the proposed increase of the assistance allowances; therefore decides to introduce in reserve the corresponding appropriations;
Enlargement
17. Welcomes the provisions for enlargement to include Croatia and approves the corresponding appropriations and staffing measures;
General establishment plan
18. Notes that apart from the requests for 68 posts linked to Lisbon and 62 linked to enlargement (including 11 posts for the groups), 17 posts are requested to complete the second year of the three-year plan for DG INLO agreed in the 2010 procedure and 30 posts for other areas that could not be covered even after 20 redeployments had been identified as possible for 2011, bringing the total to 180 new posts; requests more detailed information on the posts redeployed or transferred as from the beginning of the legislature, including estimates of redeployments and transfers for 2010 and, where possible, 2011; decides to enter the appropriations for the creation of these posts in the estimates but places the amount linked to the creation of 30 posts for "other areas" in reserve pending the analysis of the information requested;
19. Notes that the Bureau proposal now also includes 1 AD5 and 1 AST1 for the Euro Mediterranean Parliamentary Assembly and 3 AD5 and 1 AST1 posts for Risk Management but no longer contains a planned additional EUR 3 million for DG ITEC;
20. Also notes that the Bureau has included a further 56 posts for political groups;
21. Approves the 2011 measures and posts as put forward for the second year of DG INLO's three-year programme agreed last year;
22. Wishes to receive more information on the allocation of contract agent's appropriations and an overview of net-costs or net-savings to the contract agent's envelope, resulting from granted increases to its establishment plan, especially in relation to internalisation of various functions in the fields of security, ICT and library;
Buildings
23. Emphasises that a reasonable buildings policy is intimately linked to the 2011 procedure and, also to the general question of a sustainable budget;
24. Welcomes the Bureau Decision of 24 March 2010 that addresses Parliament's request for a medium to long-term property and buildings policy; expresses initial concern about the feasibility of pursuing in parallel all current and planned building operations that could emanate from the medium to long-term building strategy; is not clear over how the multitude of projects fit in with the MFF and asks for the necessary clarifications;
25. Notes in this regard the Bureau's proposal to utilise EUR 85,9 million of assigned revenue (to be used within the area of Parliament's buildings policy) for Members' offices in Brussels; recalls that any building project likely to have significant financial implications for the budget is subject to consultation of the budgetary authority under Article 179(3) of the Financial Regulation; recalls furthermore that with regard to carry-overs the Financial Regulation stipulates that assigned revenue carried over must be used first; welcomes in this context the fact that Parliament, through the reimbursement of EUR 85,9 million by the Belgian State, will be in a position to bring forward new building projects and thus accelerate the implementation of part of its medium-term property strategy;
26. Cannot agree to reserve this assigned revenue for this particular building project;
27. Calls for the resources required for medium-term property planning to be entered in the budget in future; also calls for a separate budget line to be created for large-scale property projects, in order to facilitate medium-term financial planning for building projects and to increase transparency;
28. Notes that a provision for a direct pre-financing of the initial stage of the construction of the new KAD building has been made for an amount of EUR 10,2 million on the budget line for lease payments in the Bureau's proposal; recognises that such a voluntary pre-financing would help reduce the financing costs but, taking into account the extremely tight situation for 2011, decides to enter a lower amount of EUR 6,2 million for this purpose in the estimates; is willing to reassess this amount in autumn 2010 based on an update of the budgetary situation and developments in Parliament's building policy;
Security
29. Attaches importance to the in-depth review on security policy announced by the Bureau and, in this regard, recalls its attachment to a prudent use of resources and, particularly, a cost-effective balance between internal staff and external agents; asks the Bureau to carefully examine the operational and financial implications of a new strategy, aiming to strike a good balance in the proposals to be made between security concerns on the one hand and accessibility and openness on the other hand; stresses that Parliament should remain as much as possible an open and accessible institution; for this reason wishes to receive more information from the administration concerning the so-called "Wiertz project" in order to assess its implications relating to the accessibility of Parliament for the public;
ICT Strategy
30. Welcomes the more structured approach to ICT and the elaboration of a comprehensive strategy in this field; also reiterates its support for a sufficient internalisation of functions to reduce the dependence on external providers; notes, however, that new posts were already given three years in a row; therefore considers this an issue to be clarified;
31. Notes that EUR 5 million is earmarked for a Members' IT mobility project and, in particular, to cover mobile communications; would like to receive more information given the relatively high amount;
Environment-related matters
32. Welcomes the modest increase in funding to implement the EMAS and CO2 reduction measures, spread across the entire budget, and underlines further the importance it attaches to this issue;
33. Notes the evolution of key performance indicators since 2006 in this respect as included in the Environmental Management Review for the year 2008, notably a reduction in carbon footprint of 12,9%, a decrease in electricity consumption of 0,8 %, an increase in gas/oil/ heat consumption of 7,4% in 2008, after a decrease of 17,5% in 2007, an increase in mobility/ transport emissions of 8,8%, an increase in the percentage of recycled waste from 49,8% in 2006 to 55,4% in 2008, an increase in water consumption of 18,1 % and a decrease of paper consumption of 16,9 %;
34. Welcomes the budgetary annex on environmental management which gives a good technical overview of the budget items involved; would also welcome, in this context and in the same annex, the inclusion in the annual EMAS reports of more information on the differentiated carbon footprint of the Parliament's buildings in Strasbourg, Brussels and Luxembourg as well as on session-related travel and transport, to present the current results of reducing Parliament's carbon footprint and to illustrate the beneficial impact on the environment as a result of these investments, and indeed any savings achieved in the longer term;
35. Expresses support for the pursuit of measures to further reduce Parliament's carbon footprint. Welcomes in this regards the studies underway on energy-saving-related aspects of buildings and ways to implement carbon-offsetting schemes for travel; furthermore supports incentives to use public transport instead of cars and the availability of more bicycles in Strasbourg;
36. Notes that the budget item for Members' travel costs is actually higher than the one for salaries; underlines the need for responsible use of allowances, notably travel allowances, and points out that without changing the current rules and by using, where possible, other means of transport than business class air travel from and to Parliament's places of work, Parliament's carbon footprint can be reduced and costs saved at the same time; calls on the Bureau to present, as agreed during the last pre-conciliation, in time for Parliament’s first reading, a study focused on the functioning of the new system and possible solutions for savings to be carried out;
37. Recalls that the budgets of the European institutions were given earmarked money by the budgetary authority in order to finance a public transport subsidy for staff, as an environmental measure, following an initiative from Mr. Barroso; asks for an update on the situation as regards the Parliament;
38. Asks that, where possible and appropriate, environmental statements be added to the financial statements used within the institution;
39. Believes that public procurement directives need to be better adapted to facilitate, where possible and appropriate, the inclusion of environmental and social clauses;
Multi-annual projects and other items of expenditure
40. Welcomes the agreement for an increase of EUR 2,6 million in order to finance 110 annual visitors that Members can invite instead of the current 100; takes the view that it may be appropriate to have some time to evaluate the functioning of the new visitors' centre before considering any further increase; the services responsible for the organisation of the visits should also take into account that Members may wish to split the visitor groups into different sizes over the year;
41. Approves the EUR 3 million budgeted in relation to the opening of the visitors' centre and the operating costs for a standard full year; points out the need to evaluate the initial year also from a financial point of view, including these running costs;
42. Takes note of the Bureau's decision to introduce allowances for office holders with a budgetary impact of EUR 400 000; notes, however, that the discussion on the principle was controversial; in this regard welcomes the fact that supporting documents have to be provided in order to be reimbursed for extra costs incurred in the performance of their duties;
43. Takes note of the Bureau's proposal to enter EUR 2,5 million for the House of European History, concerning studies following the results of the architect's competition currently under evaluation; recalls its request from last year to receive a clear overview of the costs envisaged for the project as a whole, including administrative costs, at the latest at the stage of the Preliminary draft estimates for the 2011 budget procedure; also recalls the agreement with the Bureau from the pre-conciliation meeting in 2009; highlights that the report of the Committee of experts to the House of European History lists 11 points, which entail further costs: (1)"academic advisor composed of experts and museum specialists", (2)"institutional independence of the institution", (3)"extensive museum-pedagogic offers", (3)"meeting place for young academics", (5)"permanent evaluation", (6)"temporary exhibit and travelling exhibition", (7)"relevant events with a European reference", (8)"own publications", (9)"extensive on-line offers", (10)"Creation of an own museums collection", (11)"continuous development of exhibitions and the infrastructure of the museum"; therefore stresses that the global cost of this project must be identified as a matter of urgency;
Horizontal issues
44. Warmly welcomes the inclusion of an initial analysis identifying fixed and variable costs in the budget proposal; recognises the methodological difficulties involved but is convinced that these concepts should be examined further; in this regard, recalls that it is awaiting a reply from the competent bodies as to how the concept of a zero-based budget policy, utilising this distinction between fixed and variable costs, could be applied in the context of the Parliament's budget procedure; requests deeper examination regarding fixed costs, distinguishing permanent fixed costs, fixed costs for fixed terms and areas where savings could be generated; requests deeper examination regarding variable costs, making a clear link between costs and objectives, policies and actions, and identifying and sorting priorities by importance;
45. Points out that the thresholds for the different public procurement procedures are currently stricter for the European institutions than those stipulated in the relevant European public procurement directives and that this situation leads to additional administrative costs and use of human resources that could be saved by better aligning the thresholds;
46. Supports activities that have a social, cultural or linguistic dimension, for staff and their families, but disapproves of individual subsidies given in that context and consequently modifies the remarks to the relevant budget item;
47. Strongly supports further efforts to make the institution better suited for disabled persons, both as regards the necessary changes to infrastructure and staff measures;
Final considerations
48. Underlines that a more detailed examination of individual budget items, including an analysis of implementation rates, should take place before the vote on the draft budget in the autumn; will thus examine and take the final budgetary decisions at that time;
49. Adopts the draft estimates for the financial year 2011 as annexed and recalls that the adoption of Parliament's position on the Draft budget, as modified by the Council, will take place in October 2010, according to the voting procedure laid down by the Treaty;
50. Approves the joint conclusions of the budgetary trilogue of 25 March 2010 annexed hereto;
o
o o
51. Instructs its President to forward this resolution and the estimates to the Council and Commission.
- [1] OJ L 248, 16.9.2002, p. 1.
- [2] OJ C 139, 14.6.2006, p. 1.
- [3] Texts adopted, P7_TA(2010)0087.
ANNEX 1: JOINT CONCLUSIONS OF THE BUDGETARY TRILOGUE OF 25 MARCH 2010
BUDGETARY TRILOGUE
25 March 2010
Conclusions
The European Parliament, the Council and the Commission have taken note of the concerns expressed by the Registrar of the Court of Justice and by the Secretaries General of the Court of Auditors, the Committee of Regions and the Economic and Social Committee in their letter sent to the Secretaries General of the European Parliament, the Council and the Commission on the new budgetary procedure and especially on the Conciliation Committee. They suggest that these institutions are invited to send directly in writing to the Conciliation Committee their remarks on the impact of the Council’s position and the European Parliament’s amendments.
ANNEX 2: DRAFT ESTIMATES
Contribution of the European Communities to the financing of the expenditure
of Parliament for the financial year 2011
Heading |
Amount |
|
|
|
|
Expenditure |
1 706 547 354 |
|
Own resources |
128 030 788 |
|
Contribution due |
1 578 516 566 |
|
REVENUE
Title Chapter Article Item |
Heading |
2011 budget |
2010 budget + AB 1/2010 |
2009 outturn |
|
4 |
REVENUE ACCRUING FROM PERSONS WORKING WITH THE INSTITUTIONS AND OTHER UNION BODIES |
|
|
|
|
4 0 |
MISCELLEANEOUS TAXES AND DEDUCTIONS |
|
|
|
|
4 0 0 |
Proceeds from taxation on the salaries, wages and allowances of Members of the institutions, officials, other servants and recipients of pensions |
48 159 863 |
47 208 729 |
45 987 620.64 |
|
4 0 3 |
Proceeds of the temporary contribution from the salaries of Members of the institution, officials and other servants in active employment |
p.m. |
p.m. |
84.54 |
|
4 0 4 |
Proceeds from the special levy on the salaries of Members of the institutions, officials and other servants in active employment |
8 209 828 |
9 157 662 |
5 709 275.13 |
|
|
Chapter 4 0 — Total |
56 369 691 |
56 366 391 |
51 696 980.31 |
|
4 1 |
CONTRIBUTION TO THE PENSION SCHEME |
|
|
|
|
4 1 0 |
Staff contributions to the pension scheme |
61 216 159 |
58 910 854 |
47 760 097.53 |
|
4 1 1 |
Transfer or purchase of pension rights by staff |
9 134.938 |
13 046 060 |
7 209 550.25 |
|
4 1 2 |
Contributions to the pension scheme by officials and temporary staff on leave on personal grounds |
10 000 |
5 000 |
0.00 |
|
|
Chapter 4 1 — Total |
70 361 097 |
71 961 914 |
54 969 647.78 |
|
4 2 |
OTHER CONTRIBUTIONS TO THE PENSION SCHEME |
|
|
|
|
4 2 1 |
Contributions by Members of the European Parliament to a retirement pension scheme |
p.m. |
p.m. |
820 485.37 |
|
|
Chapter 4 2 — Total |
p.m. |
p.m. |
820 485.37 |
|
|
Title 4 — Total |
126 730 788 |
128 328 305 |
107 487 113.46 |
|
5 |
REVENUE ACCRUING FROM THE ADMINISTRATIVE OPERATION OF THE INSTITUTION |
|
|
|
|
5 0
|
PROCEEDS FROM THE SALE OF MOVABLE PROPERTY (SUPPLY OF GOODS) AND IMMOVABLE PROPERTY |
|
|
|
|
5 0 0 |
Proceeds from the sale of movable property (supply of goods) |
|
|
|
|
5 0 0 0 |
Proceeds from the sale of vehicles — Assigned revenue |
p.m. |
p.m. |
0.00 |
|
5 0 0 1 |
Proceeds from the sale of other movable property — Assigned revenue |
p.m. |
p.m. |
15 000.00 |
|
5 0 0 2 |
Proceeds from the supply of goods to other institutions or bodies — Assigned revenue |
p.m. |
p.m. |
0.00 |
|
5 0 1 |
Proceeds from the sale of immovable property |
p.m. |
p.m. |
0.00 |
|
5 0 2 |
Proceeds from the sale of publications, printed works and films — Assigned revenue |
p.m. |
p.m. |
489 477.89 |
|
|
Chapter 5 0 — Total |
p.m. |
p.m. |
504 477.89 |
|
5 1 |
PROCEEDS FROM LETTING |
|
|
|
|
5 1 1 |
Proceeds from letting and subletting immovable property and reimbursement of charges connected with lettings |
|
|
|
|
5 1 1 0 |
Proceeds from letting and subletting immovable property — Assigned revenue |
p.m. |
p.m. |
1 324 196.29 |
|
5 1 1 1 |
Reimbursement of charges connected with lettings — Assigned revenue |
p.m. |
p.m. |
15 317.47 |
|
|
Chapter 5 1 — Total |
p.m. |
p.m. |
1 339 513.76 |
|
5 2 |
REVENUE FROM INVESTMENTS OR LOANS GRANTED, BANK AND OTHER INTEREST |
|
|
|
|
5 2 0 |
Revenue from investments or loans granted, bank and other interest on the institution's accounts |
1 300 000
|
2 000 000 |
1 316 525.41 |
|
|
Chapter 5 2 — Total |
1 300 000 |
2 000 000 |
1 316 525.41 |
|
5 5 |
REVENUE FROM THE PROCEEDS OF SERVICES SUPPLIED AND WORK CARRIED OUT |
|
|
|
|
5 5 0 |
Proceeds from the supply of services and works for other institutions or bodies, including refunds by other institutions or bodies of mission allowances paid on their behalf — Assigned revenue |
p.m. |
p.m. |
3 347 371.92 |
|
5 5 1 |
Revenue from third parties in respect of services or work supplied at their request — Assigned revenue |
p.m. |
p.m. |
3 551 741.34 |
|
|
Chapter 5 5 — Total |
p.m. |
p.m. |
6 899 113.26 |
|
5 7 |
OTHER CONTRIBUTIONS AND REFUNDS IN CONNECTION WITH THE ADMINISTRATIVE OPERATION OF THE INSTITUTIONS |
|
|
|
|
5 7 0 |
Revenue arising from the repayment of amounts wrongly paid — Assigned revenue |
p.m. |
p.m. |
1 766 049.19 |
|
5 7 1 |
Revenue earmarked for a specific purpose, such as income from foundations, subsidies, gifts and bequests, including the earmarked revenue specific to each institution — Assigned revenue |
p.m. |
p.m. |
0.00 |
|
5 7 2 |
Repayment of welfare expenditure incurred on behalf of another institution |
p.m. |
p.m. |
0.00 |
|
5 7 3 |
Other contributions and refunds in connection with the administrative operation of the institution — Assigned revenue |
p.m. |
p.m. |
3 217 174.16 |
|
|
Chapter 5 7 — Total |
p.m. |
p.m. |
4 983 223.35 |
|
5 8 |
MISCELLANEOUS PAYMENTS |
|
|
|
|
5 8 1 |
Revenue from insurance payments received — Assigned revenue |
p.m. |
p.m. |
677 015.63 |
|
|
Chapter 5 8 — Total |
p.m. |
p.m. |
677 015.63 |
|
|
Title 5 — Total |
1 300 000 |
2 000 000 |
15 659 869.3 |
|
6
|
CONTRIBUTIONS AND REPAYMENTS IN CONNECTION WITH COMMUNITY AGREEMENTS AND PROGRAMMES |
|
|
|
|
6 6 |
OTHER CONTRIBUTIONS AND REFUNDS |
|
|
|
|
6 6 0 |
Other contributions and refunds |
|
|
|
|
6 6 0 0 |
Other assigned contributions and refunds — Assigned revenue |
p.m. |
p.m. |
13 191 164.09 |
|
6 6 0 1 |
Other non-assigned contributions and refunds |
p.m. |
p.m. |
0.00 |
|
|
Chapter 6 6 — Total |
p.m. |
p.m. |
13 191 164.09 |
|
|
Title 6 — Total |
p.m. |
p.m. |
13 191 164.09 |
|
9 |
MISCELLANEOUS REVENUE |
|
|
|
|
9 0 |
MISCELLANEOUS REVENUE |
|
|
|
|
9 0 0 |
Miscellaneous revenue |
p.m. |
p.m. |
4 851 911.67 |
|
|
Chapter 9 0 — Total |
p.m. |
p.m. |
4 851 911.67 |
|
|
Title 9 — Total |
p.m. |
p.m. |
4 851 911.67 |
|
|
GRAND TOTAL |
128 030 788 |
130 328 305 |
141 250 058.52 |
|
EXPENDITURE
General summary of appropriations (2011 and 2010) and outturn (2009)
Title Chapter |
Heading |
2011 appropriations |
2010 appropriations |
2009 outturn |
|
1
1 0 |
PERSONS WORKING WITH THE INSTITUTION
MEMBERS OF THE INSTITUTION |
227 453 567 |
220 332 000 |
167 952 341.79 |
|
1 2 |
OFFICIALS AND TEMPORARY STAFF |
576 949 290 |
525 898 973 |
502 188 864.04 |
|
1 4 |
OTHER STAFF AND OUTSIDE SERVICES |
121 802 596 |
108 313 800 |
90 934 826.73 |
|
1 6 |
OTHER EXPENDITURE RELATING TO PERSONS WORKING WITH THE INSTITUTION |
15 555 500 |
15 516 000 |
12 762 741.59 |
|
|
Title 1 — Total |
941 760 953 |
870 060 773 |
773 838 774.15 |
|
2
2 0 |
BUILDINGS, FURNITURE, EQUIPMENT AND MISCELLANEOUS OPERATING EXPENDITURE
BUILDINGS AND ASSOCIATED COSTS |
189 688 366 |
186 909 476 |
193 001 220.62 |
|
2 1 |
DATA PROCESSING, EQUIPMENT AND MOVABLE PROPERTY |
119 287 071 |
117 014 150 |
106 080 063.59 |
|
2 3 |
CURRENT ADMINISTRATIVE EXPENDITURE |
15 417 000 |
12 841 500 |
10 778 698.82 |
|
|
Title 2 — Total |
324 392 437 |
316 765 126 |
309 859 983.03 |
|
3
3 0 |
EXPENDITURE RESULTING FROM GENERAL FUNCTIONS CARRIED OUT BY THE INSTITUTION
MEETINGS AND CONFERENCES |
38 879 769 |
36 074 200 |
27 499 040.69 |
|
3 2 |
EXPERTISE AND INFORMATION: ACQUISITION, ARCHIVING, PRODUCTION AND DISSEMINATION |
107 474 776 |
105 169 500 |
93 647 679.96 |
|
|
Title 3 — Total |
146 354 545 |
141 243 700 |
121 146 720.65 |
|
4
4 0 |
EXPENDITURE RESULTING FROM SPECIAL FUNCTIONS CARRIED OUT BY THE INSTITUTION
EXPENDITURE RELATING TO CERTAIN INSTITUTIONS AND BODIES |
83 650 000 |
76 965 000 |
69 215 824.15 |
|
4 2 |
EXPENDITURE RELATING TO PARLIAMENTARY ASSISTANCE |
178 050 000 |
168 974 000 |
153 358 430.04 |
|
4 4 |
MEETINGS AND OTHER ACTIVITIES OF CURRENT AND FORMER MEMBERS |
340 000 |
310 000 |
310 000 |
|
|
Title 4 — Total |
262 040 000 |
246 249 000 |
222 884 254.19 |
|
10
10 0 |
OTHER EXPENDITURE
PROVISIONAL APPROPRIATIONS |
14 164 419 |
15 691 800 |
0.00 |
|
10 1 |
CONTINGENCY RESERVE |
14 000 000 |
10 000 000 |
0.00 |
|
10 3 |
ENLARGEMENT RESERVE |
3 835 000 |
750 000 |
0.00 |
|
10 4 |
RESERVE FOR INFORMATION AND COMMUNICATION POLICY |
p.m. |
p.m. |
0.00 |
|
10 5 |
PROVISIONAL APPROPRIATION FOR BUILDINGS |
p.m. |
11 000 000 |
0.00 |
|
10 6 |
RESERVE FOR PRIORITY PROJECTS UNDER DEVELOPMENT |
p.m. |
5 000 000 |
0.00 |
|
10 8 |
EMAS RESERVE |
p.m. |
p.m. |
0.00 |
|
|
Title 10 — Total |
31 999 419 |
42 441 800 |
0.00 |
|
|
GRAND TOTAL |
1 706 547 354 |
1 616 760 399 |
1 427 729 732.02 |
|
SECTION I — PARLIAMENT
Revenue — OWN RESOURCES
Title 4 — REVENUE ACCRUING FROM PERSONS WORKING WITH THE INSTITUTIONS AND OTHER UNION BODIES
Chapter 4 0 — MISCELLEANEOUS TAXES AND DEDUCTIONS
Article 4 0 0 — Proceeds from taxation on the salaries, wages and allowances of Members of the institutions, officials, other servants and recipients of pensions
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
48 159 863 |
37 889 783 |
45 987 620,64 |
|
Remarks
Protocol on the Privileges and Immunities of the European Union, and in particular Article 12 thereof.
Council Regulation (EEC, Euratom, ECSC) No 260/68 of 29 February 1968 laying down the conditions and procedure for applying the tax for the benefit of the European Communities (OJ L 56, 4.3.1968, p. 8).
Article 4 0 3 — Proceeds of the temporary contribution from the salaries of Members of the institution, officials and other servants in active employment
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
84,54 |
|
Remarks
Council Regulation (ECSC, EEC, Euratom) No 3831/91 of 19 December 1991 amending the Staff Regulations of officials and the Conditions of employment of other servants of the European Communities with a view to introducing a temporary contribution (OJ L 361, 31.12.1991, p. 7).
Article 4 0 4 — Proceeds from the special levy on the salaries of Members of the institutions, officials and other servants in active employment
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
8 209 828 |
8 859 744 |
5 709 275,13 |
|
Remarks
Staff Regulations of Officials of the European Communities, and in particular Article 66a thereof.
Chapter 4 1 — CONTRIBUTION TO THE PENSION SCHEME
Article 4 1 0 — Staff contributions to the pension scheme
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
61 216 159 |
44 658 716 |
47 760 097,53 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Article 83(2) thereof.
Article 4 1 1 — Transfer or purchase of pension rights by staff
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
9 134 938 |
4 315 724 |
7 209 550,25 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Articles 4, 11(2) and (3) and 48 of Annex VIII thereto.
Article 4 1 2 — Contributions to the pension scheme by officials and temporary staff on leave on personal grounds
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
10 000 |
5 000 |
0,— |
|
Chapter 4 2 — OTHER CONTRIBUTIONS TO THE PENSION SCHEME
Article 4 2 1 — Contributions by Members of the European Parliament to a retirement pension scheme
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
864 000 |
820 485,37 |
|
Remarks
Rules governing the payment of expenses and allowances to Members of the European Parliament, and in particular Annex III thereto.
Title 5 — REVENUE ACCRUING FROM THE ADMINISTRATIVE OPERATION OF THE INSTITUTION
Chapter 5 0 — PROCEEDS FROM THE SALE OF MOVABLE PROPERTY (SUPPLY OF GOODS) AND IMMOVABLE PROPERTY
Article 5 0 0 — Proceeds from the sale of movable property (supply of goods)
Item 5 0 0 0 — Proceeds from the sale of vehicles — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
This item is intended to record revenue accruing from the sale or part-exchange of vehicles belonging to the institutions.
In accordance with Article 18(1)(e) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Item 5 0 0 1 — Proceeds from the sale of other movable property — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
15 000,00 |
|
Remarks
This item is intended to record revenue accruing from the sale or part exchange of movable property other than vehicles belonging to the institutions.
In accordance with Article 18(1)(e) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Item 5 0 0 2 — Proceeds from the supply of goods to other institutions or bodies — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
In accordance with Article 18(1)(g) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Details of expenditure and revenue resulting from loans or rents or the provision of services under this budget item shall be set out in an annex to this budget.
Article 5 0 1 — Proceeds from the sale of immovable property
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
This article is intended to record revenue from the sale of immovable property belonging to the institutions.
Article 5 0 2 — Proceeds from the sale of publications, printed works and films — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
489 477,89 |
|
Remarks
In accordance with Article 18(1)(j) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
This article shall also include the proceeds of the sale of these products by electronic means.
Chapter 5 1 — PROCEEDS FROM LETTING
Remarks
Article 5 1 1 — Proceeds from letting and subletting immovable property and reimbursement of charges connected with lettings
Remarks
Item 5 1 1 0 — Proceeds from letting and subletting immovable property — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
1 324 196,29 |
|
Remarks
In accordance with Article 18(1)(e) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Details of expenditure and revenue resulting from loans or rents or the provision of services under this budget item shall be set out in an annex to this budget.
Item 5 1 1 1 — Reimbursement of charges connected with lettings — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
15 317,47 |
|
Remarks
In accordance with Article 18(1)(e) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Chapter 5 2 — REVENUE FROM INVESTMENTS OR LOANS GRANTED, BANK AND OTHER INTEREST
Article 5 2 0 — Revenue from investments or loans granted, bank and other interest on the institution's accounts
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
1 300 000 |
2 500 000 |
1 316 525,41 |
|
Remarks
This article is intended to record revenue from investments or loans granted, bank and other interest on the institution's accounts.
Chapter 5 5 — REVENUE FROM THE PROCEEDS OF SERVICES SUPPLIED AND WORK CARRIED OUT
Article 5 5 0 — Proceeds from the supply of services and works for other institutions or bodies, including refunds by other institutions or bodies of mission allowances paid on their behalf — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
3 347 371,92 |
|
Remarks
In accordance with Article 18(1)(g) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Article 5 5 1 — Revenue from third parties in respect of services or work supplied at their request — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
3 551 741,34 |
|
Remarks
In accordance with Article 18(1)(e) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Chapter 5 7 — OTHER CONTRIBUTIONS AND REFUNDS IN CONNECTION WITH THE ADMINISTRATIVE OPERATION OF THE INSTITUTIONS
Article 5 7 0 — Revenue arising from the repayment of amounts wrongly paid — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
1 706 049,19 |
|
Remarks
In accordance with Article 18(1)(f) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Article 5 7 1 — Revenue earmarked for a specific purpose, such as income from foundations, subsidies, gifts and bequests, including the earmarked revenue specific to each institution — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
In accordance with Article 18(1)(c) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
Article 5 7 2 — Repayment of welfare expenditure incurred on behalf of another institution
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
This article is intended to record revenue from the repayment of welfare expenditure incurred on behalf of another institution.
Article 5 7 3 — Other contributions and refunds in connection with the administrative operation of the institution — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
3 217 174,16 |
|
Chapter 5 8 — MISCELLANEOUS PAYMENTS
Article 5 8 1 — Revenue from insurance payments received — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
677 015,63 |
|
Remarks
In accordance with Article 18(1)(h) of the Financial Regulation, this revenue is to be considered as assigned revenue and gives rise to the entry of additional appropriations against the headings which bore the initial expenditure giving rise to the corresponding revenue.
This article also includes reimbursement by insurance companies of the salaries of officials involved in accidents.
Title 6 — CONTRIBUTIONS AND REFUNDS IN CONNECTION WITH UNION AGREEMENTS AND PROGRAMMES
Chapter 6 6 — OTHER CONTRIBUTIONS AND REFUNDS
Article 6 6 0 — Other contributions and refunds
Item 6 6 0 0 — Other assigned contributions and refunds — Assigned revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
13 191 164,09 |
|
Remarks
This item is intended to record, pursuant to Article 18 of the Financial Regulation, any revenue not provided for in other parts of Title 6 and which is used to provide additional appropriations to finance expenditure to which this revenue is assigned.
Item 6 6 0 1 — Other non-assigned contributions and refunds
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Title 9 — MISCELLANEOUS REVENUE
Chapter 9 0 — MISCELLANEOUS REVENUE
Article 9 0 0 — Miscellaneous revenue
Figures
Budget 2011 |
Budget 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
4 851 911,67 |
|
Remarks
This article is intended to record miscellaneous revenue.
Details of expenditure and revenue resulting from loans or rents or the provision of services under this Article shall be set out in an annex to this budget.
Expenditure — EXPENDITURE
Title 1 — PERSONS WORKING WITH THE INSTITUTION
Chapter 1 0 — MEMBERS OF THE INSTITUTION
Article 1 0 0 — Salaries and allowances
Item 1 0 0 0 — Salaries
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
67 843 057 |
66 695 000 |
30 601 982,96 |
|
Remarks
Statute for Members of the European Parliament, and in particular Articles 9 and 10 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 1 and 2 thereof.
This appropriation is intended to cover the salary provided for by the Statute for Members.
Item 1 0 0 4 — Ordinary travel expenses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
75 396 756 |
79 319 000 |
64 968 671,93 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 20 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 10 to 21 and 24 thereof.
This appropriation is intended to cover reimbursement of travel and subsistence expenses in connection with travelling to and from the places of work and with other duty travel.
It is also intended to cover expenditure relating to any carbon offsets, as provided for in the Eco-Management Audit Scheme (EMAS) action plan adopted by the Bureau.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 10 000.
Item 1 0 0 5 — Other travel expenses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
11 396 317 |
9 170 000 |
1 874 928,93 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 20 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 22, 23 and 29 thereof.
This appropriation is intended to cover reimbursement of additional travel expenses, travel expenses incurred in the Member State of election and repatriation expenses.
It is also intended to cover expenditure relating to any carbon offsets, as provided for in the EMAS action plan adopted by the Bureau.
Item 1 0 0 6 — General expenditure allowance
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
38 330 147 |
38 144 000 |
42 629 278,00 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 20 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 25 to 28 thereof.
This allowance is intended to cover expenses resulting from the parliamentary activities of Members in their Member State of election.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 25 000.
Item 1 0 0 7 — Allowances for performance of duties
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
179 000 |
177 000 |
169 747,88 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 20 thereof.
Bureau Decision of 16-17 June 2009.
This appropriation is intended to cover the flat-rate subsistence and representation allowances in connection with the duties of the President of the European Parliament and the reimbursement of specific expenditure linked to the performance of duties as an office-holder within the European Parliament.
Article 1 0 1 — Accident and sickness insurance and other welfare measures
Item 1 0 1 0 — Accident and sickness insurance and other social security charges
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
3 477 040 |
3 417 000 |
2 557 021,72 |
|
Remarks
Statute for Members of the European Parliament, and in particular Articles 18 and 19 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 3 to 9 thereof.
Common rules on the insurance of officials of the European Communities against the risk of accident and of occupational disease.
Joint rules on sickness insurance for officials of the European Communities.
Commission Decision laying down general implementing provisions for the reimbursement of medical expenses.
Rules governing the payment of expenses and allowances to Members of the European Parliament, and in particular Article 21 and Annex IV thereto (temporary application for 18 months after the close of the sixth parliamentary term).
This appropriation is intended to cover accident insurance and reimbursement of medical expenses for Members and loss and theft of Members' personal effects.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Item 1 0 1 2 — Specific measures to assist disabled Members
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
380 000 |
350 000 |
77 327,90 |
|
Remarks
Implementing measures for the Statute for Members of the European Parliament, and in particular Article 30 thereof.
This appropriation is intended to cover certain expenditure required to provide assistance for a seriously disabled Member.
Article 1 0 2 — Transitional allowances
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 510 000 |
7 628 000 |
5 456 756,89 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 13 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 45 to 48 and 77 thereof.
This appropriation is intended to cover the transitional allowance after the end of a Member's term of office.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 10 000.
Article 1 0 3 — Pensions
Item 1 0 3 0 — Retirement pensions
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
11 131 000 |
11 215 000 |
9 583 361,56 |
|
Remarks
Statute for Members of the European Parliament, and in particular Articles 14 and 28 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 49, 50 and 75 thereof.
This appropriation is intended to cover the payment of an old-age pension after the cessation of a Member's term of office.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Item 1 0 3 1 — Invalidity pensions
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
406 742 |
504 000 |
383 595,33 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 15 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 51 to 57 and 75 thereof.
This appropriation is intended to cover the payment of a pension to Members who become incapacitated during their term of office.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 20 000.
Item 1 0 3 2 — Survivors’ pensions
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
3 072 147 |
2 744 000 |
2 690 744,23 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 17 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 58 to 60 and 75 thereof.
This appropriation is intended to cover the payment of a survivor's and/or orphan's pension in the event of the death of a Member or of a former Member.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 15 000.
Item 1 0 3 3 — Optional pension scheme for Members
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
55 000 |
169 000 |
6 433 924,46 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 27 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Article 76 thereof.
This appropriation is intended to cover the institution's contribution to the additional voluntary pension scheme for Members.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 300 000.
Article 1 0 5 — Language and data-processing courses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
800 000 |
800 000 |
525 000,00 |
|
Remarks
Implementing measures for the Statute for Members of the European Parliament, and in particular Article 44 thereof.
Bureau decision of 4 May 2009 on language and computer courses for Members.
This appropriation is intended to cover the cost of language and IT courses for Members.
Article 1 0 8 — Exchange losses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
This appropriation is intended to cover exchange differences to be met from the budget of the European Parliament in accordance with the provisions applicable to the payment of the general expenditure allowance.
Article 1 0 9 — Provisional appropriation
Item 1 0 9 0 — Provisional appropriation
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
4 076 097 |
p.m. |
0,— |
|
Remarks
This appropriation is intended to cover the effects of any adjustments to payments to Members of the institution.
This appropriation is purely provisional and may be used only after its transfer to other headings in accordance with the Financial Regulation.
Item 1 0 9 1 — Provisional appropriation for the 18 additional Members - Treaty of Lisbon
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
9 400 264 |
— |
0,— |
|
Remarks
This appropriation is intended to cover expenditure in connection with the arrival, pursuant to the Treaty of Lisbon, of the 18 additional Members.
This appropriation is purely provisional and may be used only after its transfer to other headings in accordance with the Financial Regulation.
Chapter 1 2 — OFFICIALS AND TEMPORARY STAFF
Article 1 2 0 — Remuneration and other entitlements
Item 1 2 0 0 — Remuneration and allowances
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 2 0 0 |
562 440 090 |
517 388 973 |
494 054 418,49 |
|
10 0 |
964 419 |
|
|
|
Total |
563 404 509 |
517 388 973 |
494 054 418,49 |
|
Remarks
Staff Regulations of officials of the European Communities.
Conditions of employment of other servants of the European Communities.
This appropriation is mainly intended to cover, for officials and temporary staff holding a post provided for in the establishment plan:
— salaries, allowances and other payments related to salaries,
— insurance against sickness, accident and occupational disease and other social security contributions,
— flat-rate overtime allowances,
— miscellaneous allowances and grants,
— payment of travel expenses for officials or temporary staff, their spouses and dependants from their place of employment to their place of origin,
— the impact of salary weightings applicable to remuneration and to the part of emoluments transferred to a country other than the country of employment,
— unemployment insurance for temporary staff and payments made by the institution to allow temporary staff to constitute or maintain pension rights in their country of origin.
This appropriation is also intended to cover the insurance premiums in respect of sports accidents for users of the European Parliament’s sports centre in Brussels and in Strasbourg.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 1 800 000.
Item 1 2 0 2 — Paid overtime
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
455 200 |
400 000 |
350 000,00 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Article 56 thereof and Annex VI thereto.
Conditions of employment of other servants of the European Communities.
This appropriation is intended to cover the payment of overtime under the conditions set out in the above-mentioned provisions.
Item 1 2 0 4 — Entitlements in connection with entering the service, transfer and leaving the service
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
5 034 000 |
4 900 000 |
3 520 000,00 |
|
Remarks
Staff Regulations of officials of the European Communities.
Conditions of employment of other servants of the European Communities.
This appropriation is intended to cover:
— travel expenses due to officials and temporary staff (including their families) entering or leaving the service or being transferred to another place of employment,
— installation/resettlement allowances and removal expenses due to officials and temporary staff obliged to change their place of residence on taking up duty, on transfer to a new place of employment and on finally leaving the institution and resettling elsewhere,
— daily subsistence allowance for officials and temporary staff who furnish evidence that they must change their place of residence on taking up duty or transferring to a new place of employment,
— the compensation for a probationary official who is dismissed because his work is obviously inadequate,
— compensation for a member of the temporary staff whose contract is terminated by the institution,
— the difference between the contributions paid by contract staff to a Member State pension scheme and those payable to the Community scheme in the event of reclassification of a contract.
Article 1 2 2 — Allowances upon early termination of service
Item 1 2 2 0 — Allowances for staff retired in the interests of the service
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
530 000 |
760 000 |
917 369,49 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Articles 41 and 50 thereof and Annex IV thereto.
This appropriation is intended to cover the allowances payable to officials:
— assigned non-active status in connection with action to reduce the number of posts in the institution,
— holding an AD 16 or AD 15 post who are retired in the interests of the service.
It also covers the employer's contribution to sickness insurance and the impact of weightings applicable to these allowances.
Item 1 2 2 2 — Allowances for staff whose service is terminated and special retirement scheme for officials and temporary staff
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 390 000 |
2 450 000 |
3 347 076,06 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Articles 64 and 72 thereof.
This appropriation is intended to fund:
— the allowances payable under the Staff Regulations or the regulations referred to below,
— the employer's contributions towards sickness insurance for the recipients of the allowances,
— the impact of the weightings applicable to the various allowances.
Legal basis
Council Regulation (EC, Euratom, ECSC) No 2689/95 of 17 November 1995 introducing special measures to terminate the service of temporary staff of the European Communities as a result of the accession of Austria, Finland and Sweden (OJ L 280, 23.11.1995, p. 4).
Council Regulation (EC, Euratom) No 1748/2002 of 30 September 2002 introducing, in the context of the modernisation of the institution, special measures to terminate the service of Officials of the European Communities appointed to an established post in the European Parliament and temporary staff working in the Political Groups of the European Parliament (OJ L 264, 2.10.2002, p. 9).
Article 1 2 4 — Provisional appropriation
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
7 100 000 |
|
|
|
Remarks
This appropriation is intended to cover the effects of any salary adjustments decided by the Council during the financial year.
It is provisional and may be used only after its transfer to the appropriate headings of this chapter.
Legal basis
Staff Regulations of Officials of the European Communities, and in particular Article 65 thereof and Annex XI thereto.
Reference acts
Chapter 1 4 — OTHER STAFF AND OUTSIDE SERVICES
Article 1 4 0 — Other staff and externals
Item 1 4 0 0 — Other staff
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
29 621 596 |
23 830 000 |
24 230 464,67 |
|
Remarks
Conditions of employment of other servants of the European Communities.
This appropriation is intended to cover the following expenditure:
— the remuneration, including allocations and allowances, of other staff, including contract and local staff and special advisers (within the meaning of the Conditions of employment of other servants of the European Communities), employer's contributions to the various social security schemes and the impact of salary weightings applicable to the remuneration of these staff,
— the employment of temporary agency staff.
Item 1 4 0 2 — Conference interpreters
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
60 000 000 |
55 005 000 |
43 273 028,22 |
|
Remarks
Conditions of employment of other servants of the European Communities.
Agreement on auxiliary conference interpreters.
This appropriation is intended to cover the following as part of interinstitutional cooperation:
— the fees, social security contributions, travel expenses and subsistence allowances of auxiliary conference interpreters used by Parliament to service meetings organised by Parliament or by other institutions which cannot be serviced by Parliament interpreters (officials and temporary staff),
— expenditure on conference agencies, technicians and administrators used to service the above meetings where they cannot be serviced by officials, temporary staff or other staff,
— services provided to Parliament by interpreters who are officials or temporary staff members in other institutions,
— travel expenses and subsistence allowances related to services provided to Parliament in the context of international cooperation by interpreters who are staff members of international institutions,
— language-related interinstitutional cooperation.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 200 000.
Item 1 4 0 4 — Graduate traineeships, grants and exchanges of officials
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
7 138 000 |
7 150 000 |
6 068 983,48 |
|
Remarks
Rules governing the attachment of Parliament officials and temporary staff of the political groups to national public authorities, bodies treated as such public authorities and international organisations.
Rules governing the secondment of national experts to the European Parliament.
Internal Rules governing traineeships and study visits in the Secretariat of the European Parliament.
This appropriation is intended to cover:
— an allowance and travel expenses for trainees at the beginning and end of traineeships,
— accident and sickness insurance for trainees during traineeships,
— expenditure arising from movements between the European Parliament and the public sector in the Member States or other countries specified in the rules,
— expenditure arising from the secondment of national experts to the European Parliament,
— the organising of training schemes for conference interpreters and translators, inter alia in cooperation with schools of interpreting and universities providing training in translation, as well as grants for the training and further training of interpreters and translators, purchase of teaching materials, and associated costs,
— additional costs for trainees on the pilot programme of traineeships for persons with disabilities, directly related to their disability, in accordance with Article 20(8) of the Internal Rules governing traineeships and study visits in the Secretariat of the European Parliament.
Item 1 4 0 6 — Observers
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
The appropriation is intended to cover the payment of expenses relating to observers, in accordance with Rule 11 of the European Parliament's Rules of Procedure.
Item 1 4 0 7 — Training allowance (European Parliament apprenticeship programme)
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
— |
p.m. |
0,— |
|
Remarks
This appropriation is intended to remunerate the work of trainees taking part in the European Parliament's apprenticeship programme.
Article 1 4 2 — Outside services
Item 1 4 2 0 — Outside services
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 4 2 0 |
24 200 000 |
21 945 000 |
16 953 510,86 |
|
10 0 |
|
1 155 000 |
|
|
Total |
24 200 000 |
23 100 000 |
16 953 510,86 |
|
Remarks
This appropriation is intended for the translation, typing, coding and technical assistance work sent to outside suppliers.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 200 000.
Item 1 4 2 2 — Interinstitutional cooperation activities in the language field
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
343 000 |
383 800 |
408 839,50 |
|
Remarks
This appropriation is intended to fund:
— expenditure related to actions decided on by the Interinstitutional Committee on Translation and Interpretation with a view to promoting interinstitutional cooperation in the sphere of languages,
— expenditure on publications, information activities, public relations, and participation in public events, exhibitions and language fairs.
Article 1 4 4 — Provisional appropriation
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
500 000 |
|
|
|
Remarks
This appropriation is intended to cover the effects of any salary adjustments decided by the Council during the financial year.
It is provisional and may be used only after its transfer to the appropriate headings of this chapter.
Legal basis
Conditions of employment of other servants of the European Communities.
Chapter 1 6 — OTHER EXPENDITURE RELATING TO PERSONS WORKING WITH THE INSTITUTION
Article 1 6 1 — Expenditure relating to staff management
Item 1 6 1 0 — Expenditure on recruitment
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
515 500 |
600 000 |
685 000,00 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Articles 27 to 31 and 33 thereof and Annex III thereto.
Decision 2002/620/EC of the European Parliament, the Council, the Commission, the Court of Justice, the Court of Auditors, the Economic and Social Committee, the Committee of the Regions and the European Ombudsman of 25 July 2002 establishing a European Communities Personnel Selection Office (OJ L 197, 26.7.2002, p. 53) and Decision 2002/621/EC of the Secretaries-General of the European Parliament, the Council and the Commission, the Registrar of the Court of Justice, the Secretaries-General of the Court of Auditors, the Economic and Social Committee, the Committee of the Regions, and the Representative of the European Ombudsman of 25 July 2002 on the organisation and operation of the European Communities Personnel Selection Office (OJ L 197, 26.7.2002, p. 56).
This appropriation is intended to cover:
— expenditure on organising the competitions provided for in Article 3 of Decision 2002/621/EC and travel and subsistence expenses for applicants called for interviews and medical examinations,
— the costs of organising procedures for selecting staff.
In cases duly justified by operational needs and after consultation of the European Personnel Selection Office, the institution may use some of these appropriations to organise its own competitions.
Item 1 6 1 2 — Further training
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
4 100 000 |
4 000 000 |
3 387 946,49 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Article 24a.
Conditions of employment of other servants of the European Communities.
This appropriation is intended to cover expenditure on training for improving staff skills and the performance and efficiency of the institution.
Article 1 6 3 — Measures to assist the institution's staff
Item 1 6 3 0 — Social welfare
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
650 000 |
601 000 |
516 821,63 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Articles 9(3), third subparagraph, and 76 thereof.
This appropriation is intended to cover:
— as part of an interinstitutional policy to assist persons with a disability in the following categories:
— officials and temporary staff in active employment,
— spouses of officials and temporary staff in active employment,
— dependent children within the meaning of the Staff Regulations of officials of the European Communities,
the reimbursement, to the extent permitted by the budget and after national entitlements in the country of residence or the country of origin have been exhausted, of expenses (other than medical expenses) recognised as necessary, resulting from the handicap and supported by documentary evidence and not covered by the Joint Sickness Insurance Scheme,
— action taken in respect of officials and other servants in particularly difficult situations,
— the financing of a grant for the Staff Committee and incidental expenditure in the Welfare Service. Contributions or defrayal of expenses by the Staff Committee for participants in a welfare activity shall be limited as follows:
— eligibility restricted to Parliament staff in grade AST4 and below,
— maximum amount per contribution: based on a scale that takes account of net household income and number of children.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 8 000.
Item 1 6 3 1 — Mobility
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
745 000 |
832 000 |
186 382,71 |
|
Remarks
This appropriation is intended to cover expenditure relating to mobility at the various places of work.
Item 1 6 3 2 — Social contacts between members of staff and other social measures
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
310 000 |
310 000 |
287 888,28 |
|
Remarks
This appropriation is intended to encourage and provide financial backing for schemes to promote social contact between staff of different nationalities, for example subsidies to staff clubs, sports associations, cultural societies, etc., and to make a contribution to the cost of a permanent leisure centre (cultural and sports activities, hobbies, restaurant).
It also covers financial support for interinstitutional social activities.
The amount of assigned revenue pursuant to Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 800 000.
Article 1 6 5 — Activities relating all persons working with the institution
Item 1 6 5 0 — Medical service
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 285 000 |
1 260 000 |
997 557,25 |
|
Remarks
Staff Regulations of Officials of the European Communities, and in particular Article 59 thereof and Article 8 of Annex II thereto.
This appropriation is intended to cover the operating costs of the medical service at the three places of work, including the purchase of materials and pharmaceutical products, etc., expenditure on preventive medical check-ups, expenditure arising from the operation of the Invalidity Committee and expenditure on services provided by outside medical specialists deemed necessary by the medical officers.
It also covers expenditure involving the purchase of certain work tools deemed necessary on medical grounds, together with expenditure on medical or paramedical staff under service provision arrangements or on short-term stand-in assignment.
Item 1 6 5 2 — Current operating expenditure for restaurants and canteens
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 600 000 |
2 313 000 |
2 260 000,00 |
|
Remarks
This appropriation is intended to cover restaurant and canteen management andoperating costs.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 2 000 000.
Item 1 6 5 4 — Early childhood centre and approved day nurseries
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
5 350 000 |
5 600 000 |
4 441 145,23 |
|
Remarks
This appropriation is intended to cover Parliament's contribution to all the expenditure of the early childhood centre and outside crèches with which an agreement has been concluded.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation from parental contributions is estimated at EUR 1 010 000.
Title 2 — BUILDINGS, FURNITURE, EQUIPMENT AND MISCELLANEOUS OPERATING EXPENDITURE
Remarks
Since risk cover has been revoked by insurance companies, the risk of industrial conflicts and terrorist attacks for the European Parliament buildings needs to be covered through the European Union budget.
The appropriations of this title accordingly cover all expenses in connection with damage resulting from industrial conflicts and terrorist attacks.
Chapter 2 0 — Buildings and associated costs
Article 2 0 0 — Buildings
Item 2 0 0 0 — Rent
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
34 327 626 |
33 768 000 |
28 303 815,68 |
|
Remarks
This appropriation is intended to cover rent for the buildings or parts of buildings occupied by Parliament.
It also covers property tax. The rentals are calculated over 12 months on the basis of existing leases or leases in preparation, which normally provide for cost of living or construction cost index-linking.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 500 000.
Item 2 0 0 1 — Lease payments
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
12 155 000 |
5 900 000 |
14 636 040,32 |
|
Remarks
This appropriation is intended to cover the annual lease payments for buildings or parts of buildings under existing leases or leases in preparation.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 100 000.
Item 2 0 0 3 — Acquisition of immovable property
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
9 100 000,00 |
|
Remarks
This appropriation is intended to cover the acquisition of immovable property. Subsidies for land and its servicing will be dealt with in accordance with the provisions of the Financial Regulation.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 100 000.
Item 2 0 0 5 — Construction of buildings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
7 644 000 |
4 346 600 |
3 859 764,01 |
|
Remarks
This item is intended for any entry of appropriations for the construction of buildings.
Item 2 0 0 7 — Fitting-out of premises
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
24 695 000 |
29 018 000 |
31 611 447,34 |
|
Remarks
This appropriation is intended to cover the performance of fitting-out work, including other expenditure connected with that work, in particular architects' or engineers' fees, etc.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 500 000.
Item 2 0 0 8 — Other expenditure on buildings
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 0 0 8 |
4 637 000 |
9 360 000 |
14 066 706,95 |
|
10 0 |
|
2 340 000 |
|
|
Total |
4 637 000 |
11 700 000 |
14 066 706,95 |
|
Remarks
This appropriation is intended to cover expenditure on property management not specifically provided for in the other articles in this chapter, i.e.:
— waste management and treatment,
— mandatory inspections, quality checks, expert opinions, audits, compliance monitoring, etc.,
— technical library,
— management support (building helpdesk),
— taking care of building drawings and information media,
— other expenditure.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 10 000.
Article 2 0 2 — Expenditure on buildings
Item 2 0 2 2 — Building maintenance, upkeep, operation and cleaning
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
44 749 000 |
41 407 444 |
34 464 154,98 |
|
Remarks
This appropriation is intended to cover the maintenance, upkeep, operating and cleaning costs, on the basis of current contracts, for the buildings (offices, other areas and installations) rented or owned by the European Parliament.
Before renewing or concluding contracts, the institution will consult the other institutions on the contractual terms each of them has obtained (prices, currency chosen, index-linking, duration, other clauses) with due regard for Article 91(3) of the Financial Regulation.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 75 000.
Item 2 0 2 4 — Energy consumption
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
20 947 000 |
21 487 594 |
16 917 600,84 |
|
Remarks
This appropriation is intended to cover, in particular, water, gas, electricity and heating costs.
It is also intended to cover expenditure relating to any carbon offsets, as provided for in the EMAS action plan adopted by the Bureau.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 82 000.
Item 2 0 2 6 — Security and surveillance of buildings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
39 624 740 |
40 587 000 |
38 478 370,92 |
|
Remarks
This appropriation is intended to cover essentially the costs of caretaking and surveillance in respect of buildings occupied by Parliament at its three habitual places of work and the information offices.
Before renewing or concluding contracts, the institution will consult the other institutions on the contractual terms each of them has obtained (prices, currency chosen, index-linking, duration, other clauses) with due regard for Article 91(3) of the Financial Regulation.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 180 000.
Item 2 0 2 8 — Insurance
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
909 000 |
1 034 838 |
1 563 319,58 |
|
Remarks
This appropriation is intended to cover payments in respect of insurance policy premiums.
Chapter 2 1 — DATA PROCESSING, EQUIPMENT AND MOVABLE PROPERTY
Remarks
In connection with public procurement, the institution will consult the other institutions on the contractual terms each of them has obtained.
Article 2 1 0 — Computing and telecommunications
Item 2 1 0 0 — Equipment and software for information and innovation technologies
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 1 0 0 |
35 174 000 |
36 225 000 |
43 008 335,49 |
|
10 0 |
|
4 000 000 |
|
|
Total |
35 174 000 |
40 225 000 |
43 008 335,49 |
|
Remarks
This appropriation is intended to cover expenditure on the purchase, hire, servicing and maintenance of equipment and software for the institution, and related work. This equipment and software relates mainly to systems at the computer and telecommunications centre, computing at departmental level and in the political groups and the electronic voting system.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 400 000.
Item 2 1 0 2 — Outside assistance for information and innovation technologies
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 1 0 2 |
56 481 250 |
52 637 000 |
41 155 588,44 |
|
10 0 |
|
4 000 000 |
|
|
Total |
56 481 250 |
56 637 000 |
41 155 588,44 |
|
Remarks
This appropriation is intended to cover the cost of outside assistance from service bureaux and data-processing consultants in connection with the operation of the computer centre and the network, the production and maintenance of applications, support for users, including Members and political groups, the carrying out of studies, and the drawing up and input of technical documentation.
It is also intended to cover Parliament's share of the costs of the NAP payroll application help desk set up by common accord between the institutions.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 700 000.
Article 2 1 2 — Furniture
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 1 2 |
3 224 000 |
2 998 400 |
2 508 567,53 |
|
10 0 |
|
749 600 |
|
|
Total |
3 224 000 |
3 748 000 |
2 508 567,53 |
|
Remarks
This appropriation is intended to cover the purchase, hire, maintenance and repair of furniture, including the purchase of ergonomic furniture, the replacement of worn-out and broken furniture and office machines. It is also intended to cover miscellaneous expenditure on managing Parliament's furniture stock.
In connection with works of art, this appropriation is intended to cover both the cost of acquiring and purchasing specific material and the current expenditure relating thereto, including framing, restoration, cleaning, insurance and ad hoc transport costs.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 5 000.
Article 2 1 4 — Technical equipment and installations
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
17 907 821 |
18 327 750 |
14 526 966,49 |
|
Remarks
This appropriation is intended to cover the purchase, hire, maintenance, repair and managementof technical equipment and installations, and in particular of:
— miscellaneous fixed and mobile technical installations and equipment in connection with publishing, security, canteens and buildings, etc.,
— equipment in particular for the printshop, telephone service, canteens, staff shops, security, conferences, and the audiovisual sector, etc.,
— special equipment (electronic, computing and electrical) and related external services,
— installation of two additional telephone lines in Members' offices upon request.
This appropriation also covers advertising costs for the resale and scrapping of inventoried items.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 205 000.
Article 2 1 6 — Vehicles
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
6 500 000 |
6 826 000 |
4 880 605,64 |
|
Remarks
This appropriation is intended to cover the purchase, maintenance, use and repair of vehicles (fleet of cars and bicycles) and the hire of cars, taxis, coaches and lorries, with or without drivers, including the necessary insurance cover and other management costs. When replacing the car fleet or purchasing or hiring vehicles, preference will be given to cars that are the least polluting for the environment, such as hybrid cars.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 175 000.
Chapter 2 3 — CURRENT ADMINISTRATIVE EXPENDITURE
Remarks
In connection with public procurement, the institution will consult the other institutions on the contractual terms each of them has obtained.
Article 2 3 0 — Stationery, office supplies and miscellaneous consumables
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 575 000 |
2 655 500 |
2 098 026,82 |
|
Remarks
This appropriation is intended to cover the purchase of paper, envelopes, office supplies, supplies for the print shop and reproduction workshops, etc., together with the related management costs.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 15 000.
Article 2 3 1 — Financial charges
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
370 000 |
370 000 |
318 975,87 |
|
Remarks
This appropriation is intended to cover bank charges (commission, agios and miscellaneous charges) and other financial charges, including ancillary costs for the financing of buildings.
Article 2 3 2 — Legal costs and damages
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 314 000 |
1 312 000 |
1 318 035,60 |
|
Remarks
This appropriation is intended to cover:
— costs which may be awarded against Parliament by the Court of Justice, the General Court, the Civil Service Tribunal or national courts,
— the cost of hiring outside lawyers to represent Parliament in Union and national courts, and the cost of hiring legal advisers or experts to assist the Legal Service,
— reimbursement of lawyers' fees in connection with disciplinary and equivalent proceedings,
— damages, interest and any debts within the meaning of Article 8(3) of the Financial Regulation,
— agreed compensation through amicable settlement pursuant to Articles 69 and 70 of the Rules of Procedure of the Civil Service Tribunal.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 5 000.
Article 2 3 5 — Telecommunications
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
9 405 000 |
6 850 000 |
5 529 693,88 |
|
Remarks
This appropriation is intended to cover expenditure on data transmission networks between the three places of work, the computer centres and the information offices, together with telecommunication subscriptions and charges (fixed-line and mobile telephony, television).
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 20 000.
Article 2 3 6 — Postage on correspondence and delivery charges
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
422 000 |
440 000 |
330 500,55 |
|
Remarks
This appropriation is intended to cover charges for postage, processing and delivery by national postal services or private delivery firms.
This appropriation is also intended to cover mail-handling services.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 5 000.
Article 2 3 7 — Removals
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
700 000 |
650 000 |
656 863,44 |
|
Remarks
This appropriation is intended to cover the cost of removal and handling work carried out by removal firms or by temporary handling staff supplied by outside agencies.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 40 000.
Article 2 3 8 — Other administrative expenditure
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
631 000 |
564 000 |
526 602,66 |
|
Remarks
This appropriation is intended to cover:
— insurance not specifically provided for in another Item,
— the purchase and maintenance of uniforms for ushers, drivers and removal men, medical services and various technical services,
— miscellaneous operating and management expenses, including for a mobility management centre in the context of EMAS, the purchase of railway and flight timetables, the publication of notices of sales of second-hand equipment in newspapers, etc.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Title 3 — EXPENDITURE RESULTING FROM GENERAL FUNCTIONS CARRIED OUT BY THE INSTITUTION
Chapter 3 0 — MEETINGS AND CONFERENCES
Article 3 0 0 — Expenses on staff missions and duty travel between the three working places
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
29 820 000 |
27 970 000 |
21 907 000,00 |
|
Remarks
Staff Regulations of officials of the European Communities, and in particular Article 71 thereof and Articles 11 to 13 of Annex VII thereto.
This appropriation is intended to cover expenditure on duty travel by staff of the institution, seconded national experts and trainees between place of employment and any of the European Parliament's three working places (Brussels, Luxembourg and Strasbourg) and on missions to any location other than the three working places. Expenditure is made up of transport costs, daily allowances and accommodation costs. Ancillary costs (including in connection with issuing tickets, reservations and electronic invoices, in particular for charter transport organised by the European Parliament) and any exceptional expenses are also covered.
It is also intended to cover expenditure relating to any carbon offsets, as provided for in the EMAS action plan adopted by the Bureau.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Article 3 0 2 — Entertainment and representation expenses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 047 450 |
1 105 200 |
769 155,64 |
|
Remarks
This appropriation is intended to cover:
— expenses related to the obligations of the institution regarding entertainment, including in connection with work carried out by the institution's unit for Scientific and Technological Options Assessment (STOA), and representation expenses for Members of the institution,
— representation expenses of the President when he or she is travelling outside the working places,
— representation expenses and the contribution to the secretarial expenses of the President's office,
— the Secretariat’s reception and representation expenses, including the purchase of items and medals for officials who have completed 15 or 25 years’ service,
— miscellaneous protocol expenditure, such as on flags, display stands, invitation cards, printed menus, etc.,
— travel and subsistence expenses incurred by VIP visitors to the Institution,
— entertainment and representation expenses and the other specific expenses for Members performing official duties at the European Parliament.
Article 3 0 4 — Miscellaneous expenditure on meetings
Item 3 0 4 0 — Miscellaneous expenditure on internal meetings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 594 000 |
3 050 000 |
2 124 976,46 |
|
Remarks
This appropriation is intended to cover the costs of the beverages, refreshments and occasional light meals served at meetings held by the institution, together with the management costs for these services.
Item 3 0 4 2 — Meetings, congresses and conferences
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 350 000 |
1 310 000 |
868 097,21 |
|
Remarks
This appropriation is intended to cover, inter alia:
— expenditure connected with the organisation of meetings outside the places of work (committees and committee delegations, political groups), including, where appropriate, representation expenditure,
— affiliation fees in respect of international organisations to which the European Parliament or one of its bodies belongs (Interparliamentary Union, Association of Secretaries-General of Parliaments, Twelve Plus Group within the Interparliamentary Union).
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 20 000.
Item 3 0 4 4 — Miscellaneous expenditure on the organisation of the Parliamentary Conference on the WTO and other interparliamentary, ad hoc and WTO delegation meetings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
858 000 |
850 000 |
353 756,14 |
|
Remarks
This appropriation is intended to cover in particular expenditure, other than that covered by Chapter 1 0 and Article 3 0 0, connected with the organisation of meetings of interparliamentary and ad hoc delegations, joint parliamentary committees, parliamentary cooperation committees and delegations to the WTO, and meetings of the Parliamentary Conference on the WTO and its Steering Committee.
Item 3 0 4 6 — Miscellaneous expenditure on the organisation of ACP-EU Joint Parliamentary Assembly meetings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
451 000 |
451 000 |
185 765,77 |
|
Remarks
This appropriation is intended to cover expenditure, other than that covered by Chapter 1 0 and Article 3 0 0, connected with the organisation of meetings of delegations to the ACP-EU Joint Parliamentary Assembly.
Item 3 0 4 7 — Miscellaneous expenditure on the organisation of Eurolat Parliamentary Assembly meetings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
80 000 |
50 000 |
42 493,42 |
|
Remarks
This appropriation is intended to cover expenditure, other than that covered by Chapter 1 0 and Article 3 0 0, connected with the organisation of meetings of the Eurolat Parliamentary Assembly, its committees and its bureau.
Item 3 0 4 8 — Miscellaneous expenditure on the organisation of Euromed Parliamentary Assembly meetings
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
216 319 |
40 000 |
24 796,05 |
|
Remarks
This appropriation is intended to cover expenditure, other than that covered by Chapter 1 0 and Article 3 0 0, connected with the organisation of meetings of the Euromed Parliamentary Assembly, its committees and its Bureau.
Item 3 0 4 9 — Expenditure on travel agency services
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 463 000 |
1 248 000 |
1 223 000,00 |
|
Remarks
This appropriation is intended to cover the running costs of the travel agency under contract to Parliament.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Chapter 3 2 — EXPERTISE AND INFORMATION: ACQUISITION, ARCHIVING, PRODUCTION AND DISSEMINATION
Article 3 2 0 — Acquisition of expertise
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
11 582 500 |
10 360 000 |
6 080 996,67 |
|
Remarks
This appropriation is intended to cover:
— the cost of contracts with qualified experts and research institutes for studies and other research activities (workshops, round tables, expert panels and conferences) carried out for Parliament's governing bodies and the Administration, including for the establishment of the House of European History,
— study appraisal costs and STOA's participation in scientific bodies,
— the travel, subsistence and incidental expenses of experts and other persons, including petitioners to Parliament, invited to take part in committee, study group or working party meetings,
— expenditure on calling in outside persons to take part in the work of bodies such as the Disciplinary Board or the Specialised Financial Irregularities Panel.
Article 3 2 2 — Acquisition of information and archiving
Item 3 2 2 0 — Documentation and library expenditure
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
4 593 826 |
4 432 300 |
3 512 010,23 |
|
Remarks
This appropriation is intended to cover:
— the expansion and renewal of the general reference section and the updating of the library's collection,
— subscriptions to newspapers and periodicals and news agencies and to the publications thereof and online services, including copyright fees for the reproduction and dissemination of the above in written and/or electronic form and service contracts for press reviews and cuttings,
— subscriptions or service contracts for the supply of summaries and analyses of the content of periodicals or the storage on optical media of articles taken from such periodicals,
— utilising external documentary and statistical databases (computer hardware and telecommunications charges excepted),
— the obligations assumed by the European Parliament under international and/or interinstitutional cooperation arrangements,
— the purchase or rental of special library, documentation and media library materials, including electrical, electronic and computer facilities and/or systems, as well as outside services for the acquisition, development, installation, use and maintenance of these facilities and systems,
— the cost of services relating to library activities, in particular in dealings with library customers (enquiries, analyses), and quality management systems, etc.,
— the costs of binding and conservation materials and work for the library, documentation service and multimedia resource centre,
— the cost, including materials, of internal publications (brochures, studies etc) and communication (newsletters, videos, CD-ROMs etc.),
— the purchase of new dictionaries and glossaries, or the replacement thereof, regardless of medium, including for the new language sections, and other works for the language services and the Legislative Quality Units.
Item 3 2 2 2 — Expenditure on archive fonds
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 895 000 |
1 858 200 |
1 755 946,77 |
|
Remarks
Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access to European Parliament, Council and Commission documents (OJ L 145, 31.5.2001, p. 43), and the implementing measures adopted within the European Parliament.
Bureau decision of 16 December 2002 on enhancing information and transparency: the archives of the European Parliament.
Rules on processing the papers of Members of the European Parliament, adopted by the Bureau decision of 10 October 2007, as amended by the Bureau decision of 21 April 2009.
This appropriation is intended to cover the cost of outside archiving services, such as:
— the transfer of main archives onto various media (microfilm, disc, cassette, etc.), the purchase, hire, upkeep and repair of special facilities and materials (electronic, computerised and electrical, books and magazines), including the related outside services,
— expenditure on publications on all media (brochures, CD-ROM, etc.),
— external activities to acquire primary archive sources (first-hand accounts gathered by reporters and/or historians and/or archivists, etc.) or secondary archive sources (documents on any medium).
It is also intended to cover the cost of processing the papers of Members of the European Parliament accumulated in the exercise of their office and handed over, in the form of legal donations or legacies, to the European Parliament, to the Historical Archives of the European Union (HAEU) or to an association or foundation under rules established by the European Parliament.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 20 000.
Article 3 2 3 — Relations with parliaments of third countries and support for parliamentary democracy
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
520 000 |
470 000 |
310 310,77 |
|
Remarks
Presidency Conclusions, Conference of Speakers of EU Parliaments, Copenhagen 2006 and Bratislava 2007.
Bureau Decision of 18 June 2007.
Geographical area covered: countries outside the European Union with the exception of European Union candidate and potential candidate countries.
This appropriation is intended to cover the expenditure committed for promoting relations between the European Parliament and democratically elected national parliaments from third countries as well as with corresponding regional parliamentary organisations. It relates notably to activities aimed at strengthening the parliamentary capacity in new and emerging democracies, and promoting the use of new IC technologies by parliaments.
Article 3 2 4 — Production and dissemination
Item 3 2 4 0 — Official Journal
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
5 359 450 |
5 361 000 |
6 939 095,52 |
|
Remarks
This appropriation is intended to cover the institution’s share of the Publications Office’s expenditure on publishing and dissemination and other ancillary costs with regard to the texts to be published in the Official Journal of the European Union.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 500 000.
Item 3 2 4 1 — Digital and traditional publications
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
4 224 000 |
4 395 000 |
2 749 099,12 |
|
Remarks
This appropriation is intended to cover:
— all costs for digital publishing (Intranet sites) and traditional publishing (miscellaneous documents and printed matter subcontracted out), including distribution,
— upgrading and evolutive and corrective maintenance of editorial and translation systems.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 210 000.
Item 3 2 4 2 — Expenditure on publication, information and participation in public events
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
3 2 4 2 |
19 615 000 |
13 708 000 |
16 678 677,36 |
|
10 0 |
|
3 427 000 |
|
|
Total |
19 615 000 |
17 135 000 |
16 678 677,36 |
|
Remarks
This appropriation is intended to cover expenditure on information publications, including electronic publications, information activities, public relations, participation in public events, trade fairs and exhibitions in the Member States and the accession countries, and updating of the Legislative Observatory (OEIL).
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 5 000.
This appropriation has been entered in the reserve, pending presentation of a report which identifies the expenses under Titles 2 and 3 that result from contracts or other expenses such as pay and building maintenance and costs that depend on activities or actions requiring prior approval by Parliament's competent authorities, based on a cost-benefit analysis.
Item 3 2 4 3 — Visitors Centre
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
3 000 000 |
12 100 000 |
3 897 236,76 |
|
Remarks
This appropriation is intended to finance the Visitors Centre.
Item 3 2 4 4 — Organisation and reception of groups of visitors, Euroscola programme and invitations to opinion multipliers from third countries
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
29 710 000 |
27 100 000 |
24 485 352,52 |
|
Remarks
This appropriation is intended to cover subsidies granted for group visits and associated supervision and infrastructure costs, the running costs of the Euroscola programme, and the financing of traineeships for opinion multipliers from third countries. It shall be increased every year using a deflator that takes into account movements in GNI and prices.
The maximum subsidisable number of visitors should be substantially increased. Each Member of the European Parliament should have the right to invite a maximum of five groups each calendar year for a total of 100 visitors. The number of participants present for any given visit may vary between a minimum of 10 and a maximum of 100.
An appropriate amount is included for visitors with disabilities.
The subsidy granted shall be increased in order to be duly commensurate with the distance travelled and transport conditions. The services provided for visitors should also be improved.
An evaluation as to whether the new rules take into account specific requirements and restrictions relating to the origin of visitors, proposals for an area to be set aside in the new Visitors Centre for political groups and a report concerning access by visitors groups to the new Visitors Centre and the visit to plenary, availability of meeting rooms and staffing needs for its operation have to be provided.
Item 3 2 4 5 — Organisation of seminars, symposia and cultural activities
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
2 475 000 |
2 245 000 |
1 790 335,14 |
|
Remarks
This appropriation is intended to cover expenditure or subsidies connected with the organisation of national and multinational symposia and seminars for opinion multipliers from the Member States and the accession countries, the cost of organising parliamentary symposia and seminars, and the financing of cultural projects of European interest, such as the Sakharov Prize, joint meetings of European, Israeli and Palestinian young political leaders and the European Parliament LUX Prize for European Cinema.
A maximum of EUR 300 000 of this appropriation is intended to cover expenditure on special events in the Chamber in Strasbourg and Brussels in accordance with the annual programme adopted by the Bureau.
This appropriation is also intended to cover multilingualism support measures such as meetings with interpreter training providers, measures and actions to raise awareness for multilingualism and the profession of interpreter, actions and measures taken as part of interinstitutional and international cooperation as well as participation in similar actions and measures organised jointly with other services in the context of interinstitutional and international cooperation.
It is also intended to cover the Sakharov Prize Network's operating expenses and its members' mission expenses.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 5 000.
Item 3 2 4 6 — Parliamentary television channel (Web TV)
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
9 000 000 |
9 000 000 |
8 787 767,35 |
|
Remarks
This appropriation is intended to finance the parliamentary television channel (Web TV).
An evaluation of the prototype will be made. It will have to take into consideration the content and the cost of the project, including the structures and level of participation of political groups and the definition of programme content.
Item 3 2 4 8 — Expenditure on audiovisual information
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
13 600 000 |
12 200 000 |
15 124 447,23 |
|
Remarks
European Parliament Resolution of 12 March 2002 on the guidelines for the 2003 budgetary procedure (OJ C 47 E, 27.2.2003, p. 72).
European Parliament Resolution of 14 May 2002 on the estimates of revenue and expenditure of Parliament for the financial year 2003 (OJ C 180 E, 31.7.2003, p. 150).
European Parliament Resolution of 14 May 2003 on the estimates of revenue and expenditure of Parliament for the financial year 2004 (OJ C 67 E, 17.3.2004, p. 179).
This appropriation is intended to cover:
— the operating budget of the audiovisual sector (including services under its own control and outside assistance such as technical services for radio and television stations, provision, production and coproduction of audiovisual programmes, the hiring of lines, the transmission of television and radio programmes, and other measures to develop relations between the institution and audiovisual broadcasting bodies),
— expenditure on live Internet broadcasting of plenary sittings and parliamentary committee meetings,
— the recording of part-session proceedings on DVD-ROMs,
— the establishment of appropriate archives and a search engine ensuring uninterrupted public access to that information.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 13 000.
Item 3 2 4 9 — Information exchanges with national parliaments
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
700 000 |
900 000 |
561 657,05 |
|
Remarks
Conferences of Speakers of European Parliamentary Assemblies (June 1977) and of European Union Parliaments (September 2000, March 2001). Geographical area covered: European Union countries and European Union candidate and pre-candidate countries.
This appropriation is intended to cover:
— expenditure committed for promoting relations between the European Parliament and national parliaments. It relates to parliamentary relations other than those covered by Chapters 1 0 and 3 0, exchanges of information and documentation, and assistance in the analysis and management of that information, including exchanges with the European Centre for Parliamentary Research and Documentation (ECPRD),
— funding of cooperation programmes and training schemes for officials of the aforementioned parliaments and, in general, activities to strengthen their parliamentary capacities.
Training schemes include study visits to the European Parliament in Brussels, Luxembourg and Strasbourg; the appropriation is intended to cover all or part of the expenditure incurred by participants, in particular travelling costs, travel expenses, accommodation and daily allowances,
— cooperation measures, including those linked to legislative work, and measures linked to documentation, analysis and information, including those carried out by the ECPRD.
Article 3 2 5 — Expenditure relating to Information Offices
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
1 200 000 |
1 040 000 |
974 747,47 |
|
Remarks
This appropriation is intended to cover all expenditure (staff, buildings, conferences, meetings, publications, etc.) linked to the Information Offices of the European Parliament.
Title 4 — EXPENDITURE RESULTING FROM SPECIAL FUNCTIONS CARRIED OUT BY THE INSTITUTION
Chapter 4 0 — EXPENDITURE RELATING TO CERTAIN INSTITUTIONS AND BODIES
Article 4 0 0 — Current administrative expenditure and expenditure relating to the political and information activities of the political groups and non-attached Members
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
54 850 000 |
53 750 000 |
52 337 886,15 |
|
Remarks
Rules adopted by the Bureau decision of 1 February 2001.
This appropriation is intended to cover, in respect of the political groups and the non-attached Members:
— secretarial, administrative and operational expenditure,
— expenditure on political and information activities conducted in connection with the European Union's political activities.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 50 000.
Article 4 0 2 — Contributions to European political parties
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
17 400 000 |
14 075 000 |
10 512 377,00 |
|
Remarks
Treaty on the Functioning of the European Union, and in particular Article 224 thereof.
Regulation (EC) No 2004/2003 of the European Parliament and of the Council of 4 November 2003 on the regulations governing political parties at European level and the rules regarding their funding (OJ L 297, 15.11.2003, p. 1).
Decision of the Bureau of the European Parliament of 29 March 2004 laying down the procedures for implementing Regulation (EC) No 2004/2003 of the European Parliament and of the Council on the regulations governing political parties at European level and the rules regarding their funding.
This appropriation is intended to finance political parties at European level.
Article 4 0 3 — Contributions to European political foundations
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
11 400 000 |
9 140 000 |
6 365 561,00 |
|
Remarks
Treaty on the Functioning of the European Union, and in particular Article 224 thereof.
Regulation (EC) No 2004/2003 of the European Parliament and of the Council of 4 November 2003 on the regulations governing political parties at European level and the rules regarding their funding (OJ L 297, 15.11.2003, p. 1).
Decision of the Bureau of the European Parliament of 29 March 2004 laying down the procedures for implementing Regulation (EC) No 2004/2003 of the European Parliament and of the Council on the regulations governing political parties at European level and the rules regarding their funding.
This appropriation is intended to finance political foundations at European level.
Chapter 4 2 — EXPENDITURE RELATING TO PARLIAMENTARY ASSISTANCE
Article 4 2 2 — Parliamentary assistance
Item 4 2 2 0 — Parliamentary assistance
Figures
|
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
4 2 2 0 |
177 800 000 |
168 724 000 |
153 358 430,04 |
|
10 0 |
13 200 000 |
|
|
|
Total |
191 000 000 |
168 724 000 |
153 358 430,04 |
|
Remarks
Statute for Members of the European Parliament, and in particular Article 21 thereof.
Implementing measures for the Statute for Members of the European Parliament, and in particular Articles 33 to 44 thereof.
Council Regulation No 160/2009 of 23 February 2009 amending the Conditions of employment of other servants of the European Communities (OJ L 55, 27.2.2009 p. 1).
Implementing measures for Title VII of the Conditions of Employment of Other Servants of the Communities adopted by the Bureau.
This appropriation is intended to cover parliamentary assistance expenses.
The amount of assigned revenue in accordance with Article 18(1)(e) to (j) of the Financial Regulation is estimated at EUR 400 000.
Item 4 2 2 2 — Exchange losses
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
250 000 |
250 000 |
0,— |
|
Remarks
This appropriation is intended to cover exchange differences to be met from the budget of the European Parliament in accordance with the provisions applicable to reimbursement of parliamentary assistance expenses.
Chapter 4 4 — MEETINGS AND OTHER ACTIVITIES OF CURRENT AND FORMER MEMBERS
Article 4 4 0 — Cost of meetings and other activities of former Members
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
200 000 |
170 000 |
170 000,00 |
|
Remarks
This appropriation is intended to cover the cost of meetings of the association of former Members of the European Parliament plus any other associated costs, if appropriate.
Article 4 4 2 — Cost of meetings and other activities of the European Parliamentary Association
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
140 000 |
140 000 |
140 000,00 |
|
Remarks
This appropriation is intended to cover the cost of meetings of the European Parliamentary Association plus, if appropriate, any other associated costs.
Title 10 — OTHER EXPENDITURE
Chapter 10 0 — PROVISIONAL APPROPRIATIONS
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
14 164 419 |
15 691 800 |
0,— |
|
Remarks
1. |
Item |
1 2 0 0 |
Remuneration and allowances |
964 419 |
|
2. |
Item |
4 2 2 0 |
Parliamentary assistance |
13 200 000 |
|
|
|
|
Total |
14 164 419 |
|
Chapter 10 1 — CONTINGENCY RESERVE
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
14 000 000 |
10 000 000 |
0,— |
|
Remarks
This appropriation is intended to cover expenditure resulting from budgetary decisions taken in the course of the financial year (expenditure that cannot be estimated).
Chapter 10 3 — ENLARGEMENT RESERVE
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
3 835 000 |
750 000 |
0,— |
|
Remarks
This appropriation is intended to cover the cost of the institution's preparations for enlargement.
Chapter 10 4 — RESERVE FOR INFORMATION AND COMMUNICATION POLICY
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
This appropriation is intended to cover expenditure on information and communication policy.
Chapter 10 5 — PROVISIONAL APPROPRIATION FOR BUILDINGS
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
11 000 000 |
0,— |
|
Remarks
This appropriation is intended to cover property investments and fitting-out work carried out by the institution. Parliament's Bureau is requested to adopt a coherent and responsible long-term strategy in the area of property and buildings which takes into account the particular problem of increasing maintenance costs, renovation needs and security costs and ensures the sustainability of Parliament's budget.
Chapter 10 6 — RESERVE FOR PRIORITY PROJECTS UNDER DEVELOPMENT
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
5 000 000 |
0,— |
|
Remarks
This appropriation is intended to cover expenditure on the institution’s priority projects under development.
Chapter 10 8 — EMAS RESERVE
Figures
Budget 2011 |
Appropriations 2010 |
Outturn 2009 |
|
p.m. |
p.m. |
0,— |
|
Remarks
Further to the decisions to be taken by the Bureau for implementation of the EMAS plan, in particular following Parliament's carbon audit, this appropriation is intended to endow the relevant operational headings.
Annex S — STAFF
Annex S 1 — Section I — European Parliament
Function group and grade |
2010 |
||||
Permanent posts |
Temporary posts |
||||
Others |
Political groups |
||||
Non-category |
1 |
|
|
|
|
AD 16 |
11 |
|
1 |
7 |
|
AD 15 |
35 |
|
1 |
4 |
|
AD 14 |
141 |
2 |
6 |
23 |
|
AD 13 |
227 |
8 |
2 |
30 |
|
AD 12 |
503 |
|
8 |
71 |
|
AD 11 |
131 |
|
7 |
36 |
|
AD 10 |
191 |
|
7 |
29 |
|
AD 9 |
155 |
|
7 |
17 |
|
AD 8 |
107 |
|
8 |
18 |
|
AD 7 |
259 |
|
|
23 |
|
AD 6 |
249 |
|
1 |
26 |
|
AD 5 |
360 |
|
8 |
93 |
|
AD total |
2 369 |
10 |
56 |
377 |
|
AST 11 |
91 |
10 |
|
33 |
|
AST 10 |
136 |
|
17 |
18 |
|
AST 9 |
115 |
|
3 |
27 |
|
AST 8 |
215 |
|
4 |
39 |
|
AST 7 |
653 |
|
2 |
50 |
|
AST 6 |
559 |
|
5 |
72 |
|
AST 5 |
365 |
|
8 |
64 |
|
AST 4 |
251 |
|
11 |
62 |
|
AST 3 |
124 |
|
16 |
63 |
|
AST 2 |
245 |
|
5 |
55 |
|
AST 1 |
97 |
|
|
77 |
|
AST total |
2 851 |
10 |
71 |
560 |
|
Total |
5 221[1] |
20[2] |
127[3] |
937 |
|
Grand total |
6 285[4] |
||||
|
|
|
|
|
|
Function group and grade |
2011 |
||||
Permanent posts |
Temporary posts |
||||
Others |
Political groups |
||||
Non-category |
1 |
|
|
|
|
AD 16 |
11 |
|
1 |
7 |
|
AD 15 |
35 |
|
1 |
4 |
|
AD 14 |
149 |
2 |
6 |
23 |
|
AD 13 |
279 |
8 |
2 |
34 |
|
AD 12 |
443 |
|
8 |
67 |
|
AD 11 |
131 |
|
7 |
37 |
|
AD 10 |
191 |
|
7 |
28 |
|
AD 9 |
155 |
|
7 |
17 |
|
AD 8 |
130 |
|
8 |
21 |
|
AD 7 |
304 |
|
|
22 |
|
AD 6 |
269 |
|
5 |
30 |
|
AD 5 |
363 |
|
4 |
119 |
|
AD total |
2 460 |
10 |
56 |
409 |
|
AST 11 |
151 |
10 |
|
33 |
|
AST 10 |
76 |
|
17 |
21 |
|
AST 9 |
115 |
|
3 |
30 |
|
AST 8 |
365 |
|
5 |
34 |
|
AST 7 |
753 |
|
1 |
55 |
|
AST 6 |
389 |
|
6 |
68 |
|
AST 5 |
330 |
|
7 |
66 |
|
AST 4 |
206 |
|
11 |
67 |
|
AST 3 |
184 |
|
16 |
59 |
|
AST 2 |
225 |
|
5 |
64 |
|
AST 1 |
134 |
|
1 |
98 |
|
AST total |
2 928 |
10 |
72 |
595 |
|
Total |
5 389[5] |
20[6] |
128[7] |
1004 |
|
Grand total |
6 521[8] |
||||
Annex
ASSIGNED REVENUE
Line |
Heading |
Revenue received in |
Projection |
|
2009 |
2011 |
|||
5000 |
Proceeds from the sale of vehicles |
0.00 |
364.000 |
|
5001 |
Proceeds from the sale of other movable property |
15 000.00 |
5 000 |
|
5002 |
Proceeds from the supply of goods to other institutions or bodies |
0.00 |
70 000 |
|
502 |
Proceeds from the sale of publications, printed works and films |
489 477.89 |
390 000 |
|
5110 |
Proceeds from letting and subletting immovable property |
1 324 196.29 |
1 000 000 |
|
5111 |
Reimbursement of charges connected with lettings |
15 317.47 |
150 000 |
|
550 |
Proceeds from the supply of services and works for other institutions or bodies, including refunds by other institutions or bodies of mission allowances paid on their behalf |
3 347 371.92 |
1 377 800 |
|
551 |
Revenue from third parties in respect of services or work supplied at their request |
3 551 741.34 |
p.m. |
|
570 |
Revenue arising from the repayment of amounts wrongly paid |
1 766 049.19 |
995 000 |
|
571 |
Revenue earmarked for a specific purpose, such as income from foundations, subsidies, gifts and bequests, including the earmarked revenue specific to each institution |
0.00 |
p.m. |
|
573 |
Other contributions and refunds in connection with the administrative operation of the institution |
3 217 174.16 |
p.m. |
|
581 |
Revenue from insurance payments received |
677 015.63 |
25 000 |
|
6600 |
Other assigned contributions and refunds |
13 191 164.09 |
2 102 000 |
|
|
TOTAL |
27 594 507.98 |
6 478 800 |
|
- [1] Of which six ad personam promotions (three AD 14 to AD 15, one AST 10 to AST 11, and two AST 4 to AST 5) granted in exceptional cases to deserving officials.
- [2] Notional reserve for officials seconded in the interests of the service not included in the grand total.
- [3] Of which four half-time AD (language teachers) and one AD 10 (DG-IPOL) limited to 5 years.
- [4] One AD 5 and four AST 3 (professional training) plus two AD 5 and two AST 1 (translation) have been placed in the reserve on the establishment plan with no allocation of appropriations.
- [5] Of which six ad personam promotions (three AD 14 to AD 15, one AST 10 to AST 11, and two AST 4 to AST 5) granted in exceptional cases to deserving officials.
- [6] Notional reserve for officials seconded in the interests of the service not included in the grand total.
- [7] Of which four half-time AD (language teachers) and one AD 10 (DG-IPOL) limited to 5 years.
- [8] One AD 5 and four AST 3 (professional training) plus two AD 5 and two AST 1 (translation) have been placed in the reserve on the establishment plan with no allocation of appropriations.
RESULT OF FINAL VOTE IN COMMITTEE
Date adopted |
28.4.2010 |
|
|
|
||
Result of final vote |
+: –: 0: |
35 4 0 |
||||
Members present for the final vote |
Damien Abad, Alexander Alvaro, Marta Andreasen, Francesca Balzani, Reimer Böge, Giovanni Collino, Jean-Luc Dehaene, Isabelle Durant, Göran Färm, José Manuel Fernandes, Eider Gardiazábal Rubial, Salvador Garriga Polledo, Ivars Godmanis, Estelle Grelier, Carl Haglund, Jiří Havel, Sidonia Elżbieta Jędrzejewska, Anne E. Jensen, Ivailo Kalfin, Sergej Kozlík, Jan Kozłowski, Vladimír Maňka, Barbara Matera, Claudio Morganti, Nadezhda Neynsky, Miguel Portas, Dominique Riquet, Sergio Paolo Francesco Silvestris, László Surján, Helga Trüpel, Daniël van der Stoep, Derek Vaughan, Angelika Werthmann |
|||||
Substitute(s) present for the final vote |