Go back to the Europarl portal

Choisissez la langue de votre document :

  • bg - български
  • es - español
  • cs - čeština
  • da - dansk
  • de - Deutsch
  • et - eesti keel
  • el - ελληνικά
  • en - English (Selected)
  • fr - français
  • ga - Gaeilge
  • hr - hrvatski
  • it - italiano
  • lv - latviešu valoda
  • lt - lietuvių kalba
  • hu - magyar
  • mt - Malti
  • nl - Nederlands
  • pl - polski
  • pt - português
  • ro - română
  • sk - slovenčina
  • sl - slovenščina
  • fi - suomi
  • sv - svenska
Parliamentary questions
PDF 39kWORD 16k
11 December 2020
E-005302/2020(ASW)
Answer given by Ms Vălean
on behalf of the European Commission
Question reference: E-005302/2020

1. The framework Contract with the Centre of Engineering and Product Development (CEiiA) was signed on 27 September 2018 for an initial period of 24 months, but it was not implemented after January 2020. The framework Contract was not renewed, and it ended on 26 September 2020.

2. In total, the Remotely Piloted Aircraft Systems operations in the framework of this contract were provided for 4 months in Iceland and for 2.5 months in Greece. For technical reasons linked to the implementation of the contract, the European Maritime Safety Agency decided not to renew it.

Last updated: 14 December 2020Legal notice - Privacy policy